If you find significant and critical defects should undertake a survey of specialized elements of the building organization. 17. If buildings are not permitted without the project documentation, developed and approved in accordance with established procedure, to produce: changes in space-planning decisions and the external appearance of buildings; changes in structural diagrams of the building framework as a whole or its individual parts, layout modification and improvement of the territory adjacent to the building, an addition or construction of buildings on the cover of other objects (including time), modify the schema of the supporting structures of the building or its parts, replacing them with other elements, or construction of new structures, changing the design decisions of enclosing structures and their elements (walls, doors, windows, doors, skylights, roofs and roofs, etc.); passage trenches and other earthworks, excavation of the basement in order to increase their height, or construction of new bases near the walls (foundations) without soil testing; attachment to the building (structure) elements of other adjacent (constructed) objects to the device elements of the building of new openings, holes, cuts, weakening the cross-section elements to mount These new elements, sealing of window or door openings, replacement or upgrading of technology and engineering equipment and changing patterns of their distribution; modified designs or layouts of technological and utilities; the changing nature of the regime and the process of production located in the building, causing an increase of forces, the degree or type of aggressive influence on building construction; installation, suspension or attachment other way (including temporary) on structures not provided for the project of technological or other equipment, piping, material handling and other devices, the use of structures and their elements as anchors, suspension braces stops for hoists and other machinery.